Opening Update: Let there be light(s), flooring, and loos

“If there is no struggle, there is no progress.” – Fredrick Douglass.

We are now reaping the benefits of our initials struggles, or at least that is what we are telling ourselves. Things have been coming along since we obtained our construction permit a few weeks ago.

The new lights have been installed. With 10,000 lumens of output these babies might be brighter than the sun at full blast. Good thing we put them on a dimmer!

Big Ass Lights (sorry mom, that’s their real name 🙂 )

 

The flooring has been delivered. That’s a lot of rubber! At over 300 lbs per roll its 7500 lbs total. Moving this around is going to be one heck of a workout.

 

The bathrooms have been framed in…The one on the left is just a sink and toilet while the one on the right is handicapped accessible and has a shower!!

IMG_0609

 

And the shower installed. That seat isn’t so you can take your sweet time.

 

Things are on track for our March 11th Open House event and March 13th Opening Day!